2024 AMC 10A Problems/Problem 8

Revision as of 15:53, 8 November 2024 by Tacos are yummy 1 (talk | contribs)

Problem

Amy, Bomani, Charlie, and Daria work in a chocolate factory. On Monday Amy, Bomani, and Charlie started working at $1:00 PM$ and were able to pack $4$, $3$, and $3$ packages, respectively, every $3$ minutes. At some later time, Daria joined the group, and Daria was able to pack $5$ packages every $4$ minutes. Together, they finished packing $450$ packages at exactly $2:45 PM$. At what time did Daria join the group?

$\textbf{(A) }1:25 PM\qquad\textbf{(B) }1:35PM\qquad\textbf{(C) }1:45PM\qquad\textbf{(D) }1:55PM\qquad\textbf{(E) }2:05PM$

Solution 1

Note that Amy, Bomani, and Charlie pack a total of $4+3+3=10$ packages every $3$ minutes.

The total amount of time worked is $1$ hour and $45$ minutes, which when converted to minutes, is $105$ minutes.

This means that since Amy, Bomani, and Charlie worked for the entire $105$ minutes, they in total packed $\dfrac{105}{3}\cdot10=350$ packages.

Since $450$ packages were packed in total, then Daria must have packed $450-350=100$ packages in total, and since he packs at a rate of $5$ packages per $4$ minutes, then Daria worked for $\dfrac{100}{5}\cdot4=80$ minutes, therefore Daria joined $80$ minutes before $2:45$ PM, which was at $\boxed{\text{(A) }2:45\text{ PM}}$