Difference between revisions of "2008 AMC 12A Problems/Problem 10"
(New page: Doug can paint <math>\frac{1}{5}</math> of a room per hour. Dave can paint <math>\frac{1}{7}</math> of a room in an hour. The time that they spend working together is <math>t-1</math>. Si...) |
|||
Line 1: | Line 1: | ||
+ | ==Problem 10== | ||
+ | Doug can paint a room in <math>5</math> hours. Dave can paint the same room in <math>7</math> hours. Doug and Dave paint the room together and take a one-hour break for lunch. Let <math>t</math> be the total time, in hours, required for them to complete the job working together, including lunch. Which of the following equations is satisfied by <math>t</math>? | ||
+ | |||
+ | <math>\textbf{(A)}\ \left( \frac{1}{5}+\frac{1}{7}\right)\left( t+1 \right)=1 \qquad \textbf{(B)}\ \left( \frac{1}{5}+\frac{1}{7}\right)t+1=1 \qquad \textbf{(C)}\left( \frac{1}{5}+\frac{1}{7}\right)t=1 | ||
+ | \\ | ||
+ | |||
+ | \textbf{(D)}\ \left( \frac{1}{5}+\frac{1}{7}\right)\left(t-1\right)=1 \qquad \textbf{(E)}\ \left(5+7\right)t=1</math> | ||
+ | |||
+ | ==Solution== | ||
Doug can paint <math>\frac{1}{5}</math> of a room per hour. Dave can paint <math>\frac{1}{7}</math> of a room in an hour. The time that they spend working together is <math>t-1</math>. | Doug can paint <math>\frac{1}{5}</math> of a room per hour. Dave can paint <math>\frac{1}{7}</math> of a room in an hour. The time that they spend working together is <math>t-1</math>. | ||
Since rate multiplied by time gives output: | Since rate multiplied by time gives output: | ||
<math>\left(\frac{1}{5}+\frac{1}{7}\right)\left(t-1\right)=1 \Rightarrow D</math> | <math>\left(\frac{1}{5}+\frac{1}{7}\right)\left(t-1\right)=1 \Rightarrow D</math> |
Revision as of 21:31, 18 February 2008
Problem 10
Doug can paint a room in hours. Dave can paint the same room in hours. Doug and Dave paint the room together and take a one-hour break for lunch. Let be the total time, in hours, required for them to complete the job working together, including lunch. Which of the following equations is satisfied by ?
$\textbf{(A)}\ \left( \frac{1}{5}+\frac{1}{7}\right)\left( t+1 \right)=1 \qquad \textbf{(B)}\ \left( \frac{1}{5}+\frac{1}{7}\right)t+1=1 \qquad \textbf{(C)}\left( \frac{1}{5}+\frac{1}{7}\right)t=1 \\
\textbf{(D)}\ \left( \frac{1}{5}+\frac{1}{7}\right)\left(t-1\right)=1 \qquad \textbf{(E)}\ \left(5+7\right)t=1$ (Error compiling LaTeX. Unknown error_msg)
Solution
Doug can paint of a room per hour. Dave can paint of a room in an hour. The time that they spend working together is .
Since rate multiplied by time gives output: