Difference between revisions of "2015 AMC 12B Problems/Problem 2"
Pi over two (talk | contribs) (→Problem) |
Pi over two (talk | contribs) (→Problem) |
||
Line 2: | Line 2: | ||
Marie does three equally time-consuming tasks in a row without taking breaks. She begins the first task at 1:00 PM and finishes the second task at 2:40 PM. When does she finish the third task? | Marie does three equally time-consuming tasks in a row without taking breaks. She begins the first task at 1:00 PM and finishes the second task at 2:40 PM. When does she finish the third task? | ||
− | <math>\textbf{(A)}\; | + | <math> \textbf{(A)}\; \text{3:10 PM} \qquad\textbf{(B)}\; \text{3:30 PM} \qquad\textbf{(C)}\; \text{4:00 PM} \qquad\textbf{(D)}\; \text{4:10 PM} \qquad\textbf{(E)}\; \text{4:30 PM}</math> |
==Solution== | ==Solution== |
Revision as of 16:01, 3 March 2015
Problem
Marie does three equally time-consuming tasks in a row without taking breaks. She begins the first task at 1:00 PM and finishes the second task at 2:40 PM. When does she finish the third task?
Solution
See Also
2015 AMC 12B (Problems • Answer Key • Resources) | |
Preceded by Problem 1 |
Followed by Problem 3 |
1 • 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 • 10 • 11 • 12 • 13 • 14 • 15 • 16 • 17 • 18 • 19 • 20 • 21 • 22 • 23 • 24 • 25 | |
All AMC 12 Problems and Solutions |
The problems on this page are copyrighted by the Mathematical Association of America's American Mathematics Competitions.