Difference between revisions of "2008 AMC 12A Problems/Problem 1"
I like pie (talk | contribs) (Style) |
(→Solution) |
||
(6 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
+ | {{duplicate|[[2008 AMC 12A Problems|2008 AMC 12A #1]] and [[2008 AMC 10A Problems/Problem 1|2008 AMC 10A #1]]}} | ||
==Problem == | ==Problem == | ||
A bakery owner turns on his doughnut machine at <math>\text{8:30}\ {\small\text{AM}}</math>. At <math>\text{11:10}\ {\small\text{AM}}</math> the machine has completed one third of the day's job. At what time will the doughnut machine complete the job? | A bakery owner turns on his doughnut machine at <math>\text{8:30}\ {\small\text{AM}}</math>. At <math>\text{11:10}\ {\small\text{AM}}</math> the machine has completed one third of the day's job. At what time will the doughnut machine complete the job? | ||
Line 8: | Line 9: | ||
Since the machine was started at <math>\text{8:30 AM}</math>, the job will be finished <math>8</math> hours later, at <math>\text{4:30 PM}</math>. The answer is <math>\mathrm{(D)}</math>. | Since the machine was started at <math>\text{8:30 AM}</math>, the job will be finished <math>8</math> hours later, at <math>\text{4:30 PM}</math>. The answer is <math>\mathrm{(D)}</math>. | ||
+ | |||
+ | Note: <math>\text{2:40}</math> means <math>2</math> hours and <math>40</math> minutes. <math>3</math> multiplied by this time interval is <math>8</math> hours. | ||
==See Also== | ==See Also== | ||
− | {{AMC12 box|year=2008|ab=A|before=First | + | {{AMC12 box|year=2008|ab=A|before=First Question|num-a=2}} |
+ | {{AMC10 box|year=2008|ab=A|before=First Question|num-a=2}} | ||
+ | {{MAA Notice}} |
Latest revision as of 16:18, 4 June 2021
- The following problem is from both the 2008 AMC 12A #1 and 2008 AMC 10A #1, so both problems redirect to this page.
Problem
A bakery owner turns on his doughnut machine at . At the machine has completed one third of the day's job. At what time will the doughnut machine complete the job?
Solution
The machine completes one-third of the job in hours. Thus, the entire job is completed in hours.
Since the machine was started at , the job will be finished hours later, at . The answer is .
Note: means hours and minutes. multiplied by this time interval is hours.
See Also
2008 AMC 12A (Problems • Answer Key • Resources) | |
Preceded by First Question |
Followed by Problem 2 |
1 • 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 • 10 • 11 • 12 • 13 • 14 • 15 • 16 • 17 • 18 • 19 • 20 • 21 • 22 • 23 • 24 • 25 | |
All AMC 12 Problems and Solutions |
2008 AMC 10A (Problems • Answer Key • Resources) | ||
Preceded by First Question |
Followed by Problem 2 | |
1 • 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 • 10 • 11 • 12 • 13 • 14 • 15 • 16 • 17 • 18 • 19 • 20 • 21 • 22 • 23 • 24 • 25 | ||
All AMC 10 Problems and Solutions |
The problems on this page are copyrighted by the Mathematical Association of America's American Mathematics Competitions.